| Machinery arrived. The pile of soil was dug out of the drain. |
| Clearing debris from the drain for the lorry to chuck away. |
| Materials arrived. |
| Men started work. |
| Work started on the wall of the monsoon drain. |
| Piling and reinforcements. |
| The 'concrete' vehicle arrived. |
| wow, so much work just to re-build drain walls. |
| Repairing the edge at the front - the part that didn't collapse. |
| Patching up the cracks. |
| Walling the fence. Luckily the weather was fine and sunny so the contractors can work continuously. |
| Concrete reinforcements for extra support which should have been done by the Developer because of the substantial width of this drain. |
| They even knocked down the last panel at the back and re-build it. |
| Walling near completion. |
| Finishing works - patching up here and there. |
| Knocking out the uneven part and patching up the front "unfallen" part of the fence in order to straighten the whole fence. |
| The front part - all made good....... |
| ..... with reinforcements. Now I don't have to jump across. I can walk across. |
| The unpainted part was the 'fallen' portion of the fence. Now, it's nice and straight. |
It took the contractors 2 weeks to complete the job right at the end of the year on 30 December 2011. During that 2 weeks of work, weather was fine so activities went uninterrupted. This group of contractors appointed by the Council did a very good job and I'm happy that the work was carried out smoothly and efficiently. There was a lot of teamwork among the workers and the supervisors were capable and efficient. Luckily for me, the flash flood that took 2 lives happened 5 days after completion of works on 5 January 2012.